Skip to content

What actually happens during a website redesign

Marinkovic Nikola Founder & lead designer
Close-up of hands sketching interface wireframes on paper

A redesign sounds like a single event. In practice it is four distinct phases, each with its own decisions, and most of the problems people associate with redesigns come from skipping or rushing one of them. Here is what actually happens, in order, on a typical six to ten week project.

Phase 1: Discovery and audit (week 1)

Before anyone opens a design tool, we look at what exists. Analytics, if there are any: where visitors arrive, where they leave, which pages do work and which are decoration. The current content, page by page. The competition. And the business itself: what it sells now, who it sells to, and what has changed since the current site was built.

The output is a short document: what the new site has to achieve, who it is for, what stays, what goes, and a sitemap. This is also where scope and price are fixed.

Phase 2: Onboarding and structure (week 2)

The unglamorous phase, and the one that decides whether the project runs smoothly. Content is inventoried and assigned: which case studies need writing, which photos need shooting, who signs off on copy. A shared timeline is agreed. The design system foundations are set: type, colour, spacing, the grid.

Wireframes for the key pages are produced here. They are deliberately plain. The point is to agree what goes where and in what order before anyone argues about colour.

Phase 3: Creating (weeks 3 to 7)

Design and build overlap. The homepage and one or two template pages are designed first and reviewed. Once the direction is approved, the remaining pages follow quickly because the system is established. Development starts as soon as the first designs are signed off, so by the time the last page is designed, most of the site is already built.

Feedback happens in structured rounds, usually two per stage. Comments are collected in one place, from one decision maker, and resolved together. This is where projects with committees slow down.

Content arrives in parallel. Real copy replaces placeholder text as early as possible, because layouts change when the words are real.

Phase 4: Handover (weeks 8 to 10)

Testing across browsers and devices. Performance tuning. Accessibility checks. Redirects from old URLs so nothing that ranked is lost. Analytics and forms verified. A CMS walkthrough with the people who will maintain the site, plus written documentation.

Then launch, usually on a quiet day of the week, with someone watching for the first 48 hours.

What makes the difference

Three things separate the redesigns that go well from the ones that drag: a clear outcome agreed in week one, content handled early instead of last, and a single person empowered to make decisions. Get those right and the design and build are the enjoyable part.

Schedule a call

Ready to start a project?

Pick a time for a 15-minute call. We’ll look at where your website is today and tell you honestly if we’re the right fit.

Booking for Q4 · 3 spots available

Loading the calendar…

Not ready for a call?

Send us a message. We reply within one business day.